Skip to main content

Projects

Shipley Manor – Wilmington, DE

This project took 10 weeks to complete. In that time, we removed 100,000 sq ft with a combination of EPDM and TPO roofing systems that were expired. We then installed an R-30 insulation package complete with dens deck and a 20-year NDL Duro-Last roofing system. The system installed was a Rhino-bond system to help reduce the costs of the fully adhered. We removed the shingles around the pent of the roof and replaced it with a 30-year Tamko system.

Jolibee – Philadelphia, PA

We were excited to put the roof on the very first Jolibee in Pennsylvania! Here we installed an R-30 Firestone .060 TPO 20-year NDL roofing system. This system was mechanically attached and was competed in 4 days.

Extra Space Storage – Plymouth Meeting, PA

We installed a flute-filled roofing system over an existing 10,000 sq ft metal roof. In this application we filled the cavities of the metal roof with a ½ inch HD board to provide a flat surface. Then we installed a fully adhered Firestone .060 TPO 20-year NDL roofing system. This project was completed in 2 days.

Mavis Tires – Lancaster, PA – Current Project

All Kids Dental – Manahawkin, NJ – Current Project

Why Us

FULL WARRANTIES

CERTIFIED INSTALLERS

CERTAINTEED SHINGLE MASTERS


Clients