Shipley Manor – Wilmington, DE
This project took 10 weeks to complete. In that time, we removed 100,000 sq ft with a combination of EPDM and TPO roofing systems that were expired. We then installed an R-30 insulation package complete with dens deck and a 20-year NDL Duro-Last roofing system. The system installed was a Rhino-bond system to help reduce the costs of the fully adhered. We removed the shingles around the pent of the roof and replaced it with a 30-year Tamko system.