Projects
Shipley Manor (LCS Development)
Wilmington, DE
This project took 10 weeks to complete. In that time, we removed 100,000 sq ft with a combination of EPDM and TPO roofing systems that were expired. We then installed an R-30 insulation package complete with dens deck and a 20-year NDL Duro-Last roofing system. The system installed was a Rhino-bond system to help reduce the costs of the fully adhered. We removed the shingles around the pent of the roof and replaced it with a 30-year Tamko system.
Extra Space Storage
Plymouth Meeting, PA
We installed a flute-filled roofing system over an existing 10,000 sq ft metal roof. In this application we filled the cavities of the metal roof with a ½ inch HD board to provide a flat surface. Then we installed a fully adhered Firestone .060 TPO 20-year NDL roofing system. This project was completed in 2 days.
Mavis Tires (Berks Construction)
Lancaster, PA
For this project we installed 5,500 square feet of Rhinobond .060 Firestone TPO roofing system complete with a 20-year NDL. We also installed a commercial grade slag stop around the perimeter along with a Firestone gutter. We completed this project in 4 days.
Why Us
FULL WARRANTIES
CERTIFIED INSTALLERS
CERTAINTEED SHINGLE MASTERS
Clients




